Summary
Chapter 3
Maastricht University · Economics and Business Economics
Y2 - Accounting for Managerial Decision MakingInhoud
De koppen uit dit document, op volgorde. Niet de inhoud zelf.
- Summary
- ASSIGNMENT OF DIRECT AND INDIRECT COSTS
- PLANT-WIDE (BLANKET) OVERHEAD RATES
- THE TWO-STAGE ALLOCATION PROCESS
- Step 1: Assigning overheads to cost centres
- Step 2: Reallocating costs assigned to service cost centres to production cost centres
- Step 3: Computing separate overhead rates for each production cost centre
- Step 4: Assigning cost centre overheads to products or other chosen cost objects
- AN ILLUSTRATION OF THE TWO-STAGE PROCESS FOR AN ABC SYSTEM
- EXTRACTING RELEVANT COSTS FOR DECISION-MAKING
- BUDGETED OVERHEAD RATES
- UNDER- AND OVER-RECOVERY OF OVERHEADS
- NON-MANUFACTURING OVERHEADS
- THE INDIRECT COST ASSIGNMENT PROCESS
Samen studeert beter
Lees het volledige document
Log in met een gratis account om dit document te lezen.
